Introduction 
When preparing for large-scale floor coating projects, testing is essential to ensure that the final result meets expectations. A recent example demonstrates how testing a Mortarthane™ HF urethane cement floor resurfacer on a small section of a meat processing plant floor helped identify and resolve potential issues before full installation. 

Why Test Coatings Before Full Application? 
Testing a small sample area before the full project allows building owners and facility managers to verify that the chosen coating meets specific needs like traction, texture, and durability. This proactive step saves time and money by identifying adjustments early, ensuring that the final installation is perfect for the facility’s operational demands. 

Step-by-Step Guide to Testing Industrial Coatings 

  1. Prepare the Test Area: Select a small section, typically around 30 square feet, to apply the sample coating. 
  2. Apply the Coating: Use the selected product, such as Mortarthane™ HF, to resurface the test area. 
  3. Evaluate Performance: Subject the sample coating to real-world conditions, including foot traffic and equipment use. 
  4. Request Modifications: If necessary, adjust the texture or traction (e.g., adding aluminum oxide aggregate for enhanced grip). 
  5. Confirm Fit: Ensure the final product meets your expectations and needs before committing to the full project. 

Testing coatings before full-scale application provides invaluable insights into how the product will perform over time. It allows facility owners to customize their coating systems, ensuring a durable, safe, and high-performing floor. 

A little preparation today means a smoother, more efficient flooring project tomorrow.