Transform outdoor loading zones with JOINT-GUARD™...
The Challenge
A busy distribution center in Spring Lake Heights faced frequent damage to its outdoor loading zone expansion joints due to constant steel wheel traffic. Traditional fillers were unable to withstand the stress, leading to costly repairs and operational disruptions.
Step-by-Step Application of JOINT-GUARD™
- Surface Preparation
Thoroughly clean the joints to remove debris, dust, and contaminants. Ensure the area is dry and free from standing water. - Mixing
Combine the black and white components of JOINT-GUARD™ in the provided ratio. Mix until a uniform color is achieved, ensuring proper blending for optimal performance. - Application
Pour the mixed JOINT-GUARD™ into the prepared joints. Allow the material to self-level, filling the joint completely. Use a trowel to smooth the surface if necessary. - Curing
Allow the material to cure for 16–24 hours at 70°F before exposing the area to light traffic. For heavy traffic, a longer curing time may be required.
The Outcome
Post-application, the loading zone experienced a significant reduction in joint failures. JOINT-GUARD™'s flexibility and durability provided a long-lasting solution, minimizing maintenance costs and enhancing operational efficiency.
Long-Term Results
By choosing JOINT-GUARD™, the distribution center not only addressed their immediate joint repair needs but also invested in a sustainable solution that supports their long-term operational goals. This case underscores the importance of selecting the right materials for high-traffic areas to ensure safety, efficiency, and cost-effectiveness.